Number Title Due Date Other Files Tab Sheet
20-59 Installation of Sugg Parkway Foundations Wed, 12/16/2020 - 2:00pm
20-57 RFB for One Backhoe Thu, 12/10/2020 - 3:00pm
20-56 RFP for Drive Thru System Tue, 12/15/2020 - 4:00pm
20-55 RFB for Switchgears Wed, 11/18/2020 - 3:00pm
20-54 RFB for Pole Racks Tue, 11/03/2020 - 3:00pm
20-53 RFP for Offsite Storage Thu, 11/19/2020 - 3:00pm
20-52 RFB for Green Mill Run & Tar River Outfalls Sewer Rehabilitation Phase IV Thu, 12/03/2020 - 3:00pm
20-51 RFB for Installation of 115 kV Transmission Structures along Sugg Parkway Tap Thu, 11/05/2020 - 3:00pm PDF icon 20-51_bid_tab_2.pdf
20-50 One (1) 60’ Aerial Tower Unit Mounted with Utility Line Body & 1,250 lbs. Material Handling Package Wed, 11/04/2020 - 3:00pm PDF icon 20-50_bid_tab.pdf
20-49 RFB for TWO (2) 20 MVA, 115 TO 13.2Y/7.62 kV POWER TRANSFORMER WITH LOAD TAP CHANGER FOR SUGG PARKWAY & SPARE Wed, 10/21/2020 - 3:00pm PDF icon 20-49_bid_tab.pdf
20-48 RFP for Upgrade Mon, 10/05/2020 - 3:00pm PDF icon 20-48_ranking.pdf
20-47 RFP for EBS Managed Services Mon, 10/05/2020 - 3:00pm PDF icon 20-47_ranking.pdf
20-46 RFP for Walkways Mon, 10/05/2020 - 3:00pm PDF icon 20-46_bid_tab.pdf
20-45 RFQ for Fencing and Installation Tue, 10/06/2020 - 3:00pm
20-44 RFB for Cable Tue, 09/22/2020 - 4:00pm PDF icon 20-44_rfb_for_ug_primary_cable_09.22.2020_4pm_gm_-_web.pdf
20-43 RFP for Custodial Services for NOC Wed, 09/23/2020 - 3:00pm PDF icon 20-43_bid_tab.pdf
20-42 RFQ for Sanitary Sewer Outfall and Water Distribution/Transmission Line Right-of-Way Clearing Thu, 09/03/2020 - 4:00pm PDF icon 20-42_bid_tab_for_signature_-_web.pdf
20-41 Precast Concrete Relay Control House for the Sugg Parkway Substation Wed, 09/09/2020 - 3:00pm PDF icon 20-41_bid_tab.pdf
20-40 RFP for One Shelter Wed, 09/16/2020 - 3:00pm PDF icon 20-40_bid_tab.pdf
20-39 RFP for GUC Sewer Master Plan Tue, 09/01/2020 - 4:00pm
20-38 RFB for 15.5 KV Power Circuit Breakers Thu, 08/13/2020 - 3:00pm PDF icon 20-38_bid_tab.pdf
20-37 RFB for Water Meters Wed, 08/12/2020 - 4:00pm PDF icon 20-37_bid_tab.pdf
20-36 RFB for One 75' Mechanical Trimmer Wed, 08/12/2020 - 3:00pm PDF icon 20-36_bid_tab.pdf
20-35 RFP Design-build Services Fleet Maintenance Building Mon, 08/17/2020 - 3:00pm PDF icon 20-35_bid_tab.pdf
20-34 RFB for Peak Shaving Generation System Wed, 08/19/2020 - 3:00pm PDF icon 20-34_bid_tab.pdf

Pages