13-06 |
RFQ for Ball Valves and Strainers |
Thu, 03/07/2013 - 09:00pm |
- |
13-06-tab-ball-valves-and-strainers-03-07-13-web.pdf
|
13-05 |
RFP for City of Greenville and Greenville Utilities Commission Benefit Consultant |
Thu, 03/14/2013 - 09:00pm |
|
13-05-rfp-for-city-of-greenville-and-guc-benefit-consultant-03-14-13-award-notice.pdf
|
13-04 |
RFB for Load Management Switches |
Wed, 03/20/2013 - 06:00pm |
- |
13-04-tab-load-mgr-switches-03-20-13-web.pdf
|
13-03 |
RFP for Natural Gas Distribution System Leak Detection Survey |
Fri, 03/01/2013 - 09:00pm |
|
13-03-tab-rfp-for-2013-leak-detection-survey-tab-web.pdf
|
13-02 |
RFB For Water & Sewer Materials |
Fri, 02/15/2013 - 08:00pm |
- |
13-02_tab_results_water_sewer_materials_bid_tab_02_15_13_-_web.pdf
|
13-01 |
Transformers RFB |
Thu, 02/07/2013 - 07:00pm |
- |
13-01_tab_sheet_transformers_combined_web.pdf
|
12-58 |
RFB for One (1) 60’ Aerial Tower Unit Mounted with Utility Line Body & 1,250 lbs. Material Handling Package |
Wed, 11/03/2021 - 07:00pm |
- |
- |
12-49 |
Couplings and Caps |
Tue, 01/29/2013 - 08:00pm |
- |
12-49_tab_sheet_couplings_caps_01_29_2013.pdf
|
12-48 |
Design and Installation of Cathodic Protection Rectifier and Anode Bed |
Fri, 01/25/2013 - 09:00pm |
|
12-48-tab-rfq-for-design-and-installation-of-cathodic-protection-rectifier-and-anode-bed-tab-web.pdf
|
12-47 |
Construction of the partial roof replacement of the Old Engineering Building, Revision 1 |
Wed, 12/19/2012 - 07:00pm |
|
12-47_tab_guc_bid_rejection.pdf
|
12-46 |
Advertisement for Utility Poles |
Fri, 11/09/2012 - 07:30pm |
- |
- |
12-45 |
RFB for approximately 30,000' of 2/0 Triplex Cable "Shaw" and 99,000' of 1/0 UG Primary Cable |
Wed, 11/07/2012 - 07:00pm |
- |
12-45_tab_cable_tabulation_11_07_12_bid_tab_web.pdf
|
12-44 |
RFQ for Dead-End Shoes, Stirrup Clamps, Cable Clamps, Strandvises And Guy Guards |
Thu, 11/01/2012 - 07:00pm |
- |
12-44_tab_dead_end_shoes_etc_11_01_12_tab_web.pdf
|
12-43 |
RFB for Employee Uniforms |
Wed, 11/14/2012 - 07:00pm |
- |
12-43_tab_employee_uniform_tab_-_web.pdf
|
12-42 |
RFB For Tubular Steel Structures For The MacGregor Downs Road and B's Barbecue Road Engineered Distribution Poles |
Thu, 11/08/2012 - 08:30pm |
|
12-42_tab_tubular_steel_structures_11_08_12_-_tab_-_website.pdf
|
12-41 |
RFP for (1) One Pre Engineered Constructed Metal Building |
Wed, 10/24/2012 - 08:00pm |
|
12-41_tab_one_pre_engineeded_constructed_metal_building_10_24_12_-_web.pdf
|
12-40 |
RFB For Crushed Stone |
Thu, 10/18/2012 - 06:00pm |
|
12-40_tab_results_crushed_stone_10_18_12_approval_-_web.pdf
|
12-39 |
RFB for Light Bulbs |
Thu, 10/04/2012 - 07:00pm |
- |
12-39_tab_sheet_light_bulbs_10_04_12_web.pdf
|
12-38 |
Disposal of Scrap Metals For Recycling |
Tue, 10/09/2012 - 06:00pm |
- |
12-38_disposal_of_scrap_metals_for_recycling_10_09_12_tab_sheet_-_web.pdf
|
12-37 |
RFB for One (1) Line Truck with Hydraulic Digger-Derrick Mounted with Utility Line Body |
Tue, 09/25/2012 - 06:00pm |
- |
12-37_bid_tab-one_-1-_line_truck_with_hydraulic_digger-derick_mounted_with_utility_body_9_25_12_-_approval_-_web.pdf
|
12-36 |
One (1) 4-Wheel Drive Quad Track, Front and Rear Steer, Backhoe, Plowing Machine With Backfill Blade |
Thu, 09/27/2012 - 06:00pm |
|
12-36_bid_tab-one_-1-_4-wheel_drive_quad_track_front_and_rear_steer_backhoe_plowing_machine_with_backfill_blade_-_web.pdf
|
12-35 |
One (1) Line Truck with Hydraulic Digger-Derrick Mounted with Utility Line Body |
Wed, 09/05/2012 - 06:00pm |
|
12-35_bid_tab-one_-1-_line_truck_with_hydraulic_digger-derick_mounted_with_utility_body_9_5.pdf
|
12-34 |
RFB for One (1) Dump Truck |
Thu, 08/30/2012 - 06:00pm |
- |
12-34_bid_tab-one_dump_truck-approval_-_web.pdf
|
12-33 |
RFB For One (1) Two Ton Utility Truck |
Wed, 08/22/2012 - 06:00pm |
|
12-33_bid_tab-one_two_ton_utility_truck_-approval_-_web.pdf
|
12-32 |
RFB for Tools |
Thu, 08/09/2012 - 08:00pm |
- |
12-32_bid_tab_rfb_for_tools_-website.docx.pdf
|